Bando 10D144 Power King Combo, DM144 INDUSTRIAL PUMPS

Regular price $ 664.00
Tax included. Shipping calculated at checkout.
Description

Bando 10D144 Power King Combo, DM144 INDUSTRIAL PUMPSBando 10D144 To resolve problem applications where belts are flipping over or jumping out of the sheaves, utilize Bandos series of Combo belts. The tie band assures lateral rigidity and guides the belts into the sheave grooves. The tie band, reinforced with high strength transverse tensile cords, is fully oil and heat resistant and permanently welds the individual belts together. Combos utilize the premium quality Power King and Power Ace belts, with

Bando - 150-DS8M-1392 Synchro-Link® Double Sided Timing Belts provide smooth

Catalog Number ECP3771T Enclosure TEFC Frame 215T Frame Material Iron Frequency 60

US Motors1859

000 HP @ 50 HZ Phase 3 Synchronous Speed @ Frequency 1500 RPM @ 50 HZ Voltage @ Frequency 190

Packard82635

Amperes 1562 A LRC 5

12CB1500 & 12CB1503 LID

Bando - 100-DS14M-1904 Synchro-Link® Double Sided Timing Belts provide smooth

1 a Front Face Code Standard Front Shaft Indicator None Heater Indicator No Heater Insulation Class H Inverter Code Not Inverter KVA Code J Lifting Lugs Standard Lifting Lugs Locked Bearing Indicator Locked Bearing Motor Lead Exit Ko Box Motor Lead Termination Flying Leads Motor Lead Quantity/Wire Size 3 @ 16 AWG Motor Type 3646M Mounting Arrangement F1 Number of Poles 4 Overall Length 18

lb Locked rotor torque 200 % Breakdown torque 240 % Locked rotor time 100s (cold) 56s (hot) Moment of inertia (J) 176 sq

0 a Heater Indicator No Heater Insulation Class F Inverter Code Inverter Ready IP Rating NONE KVA Code G Lifting Lugs Standard Lifting Lugs Motor Lead Quantity/Wire Size 6 @ 2/0 AWG Motor Type A44084M Mounting Arrangement F1 Number of Poles 2 Overall Length 39

15 STARTCAPMFD N\A SHIPPING WEIGHT 127 BREAKDOWN TORQUE 268 BREAKDOWN TORQUE UOM PERCENT OF FLT LOCKED ROTOR TORQUE 170 LOCKED ROTOR TORQUE UOM PERCENT OF FLT INSULATION CLASS F KVA CODE LETTER F LOCKED ROTOR AMPS 108

Easy Shipping

Quick Dispatch:

Your Bando 10D144 Power King Combo, DM144 INDUSTRIAL PUMPS orders ship within 1-2 business days.

Delivery Options:

  • Standard: 3-7 business days
  • Fast: 2-3 business days
  • Express: 1-2 business days

Order Tracking:

You'll receive a tracking link by email once your Bando 10D144 Power King Combo, DM144 INDUSTRIAL PUMPS ships.

Need Help?
Questions about Bando 10D144 Power King Combo, DM144 INDUSTRIAL PUMPS, sizing, or delivery? We're just an email away.

Live Shipping Estimates:
Enter your location at checkout to see available shipping methods and costs for Bando 10D144 Power King Combo, DM144 INDUSTRIAL PUMPS in your area.

Get Shipping Estimates

You may also like

recommand products

{{{showcase_5_name}}}

US$ {{{showcase_5_price}}}

Min. order: 1 piece

{{{showcase_5_star}}} ({{{showcase_5_reviews}}} reviews)

Sold : Login>>

{{{showcase_6_name}}}

US$ {{{showcase_6_price}}}

Min. order: 1 piece

{{{showcase_6_star}}} ({{{showcase_6_reviews}}} reviews)

Sold : Login>>

{{{showcase_7_name}}}

US$ {{{showcase_7_price}}}

Min. order: 1 piece

{{{showcase_7_star}}} ({{{showcase_7_reviews}}} reviews)

Sold : Login>>

{{{showcase_8_name}}}

US$ {{{showcase_8_price}}}

Min. order: 1 piece

{{{showcase_8_star}}} ({{{showcase_8_reviews}}} reviews)

Sold : Login>>

{{{showcase_9_name}}}

US$ {{{showcase_9_price}}}

Min. order: 1 piece

{{{showcase_9_star}}} ({{{showcase_9_reviews}}} reviews)

Sold : Login>>

{{{showcase_10_name}}}

US$ {{{showcase_10_price}}}

Min. order: 1 piece

{{{showcase_10_star}}} ({{{showcase_10_reviews}}} reviews)

Sold : Login>>